In short: a technical proposal is rarely lost on one big mistake. It is lost on a forgotten requirement, a misplaced sub-criterion, a reference that is too old or a badly named file. Here are 25 points to tick before every submission, grouped into six steps. Print it, or copy it into your own template.
This checklist is a free tool. It does not replace reading the tender rules, which remain the only reference for your tender.
1. Reading the tender documents
- ☐ Point 1. I have read the tender rules, administrative clauses and technical specifications in full, appendices included, along with any corrigenda and answers to questions published during the tender.
- ☐ Point 2. I have noted the award criteria, sub-criteria and their weighting.
- ☐ Point 3. I have noted the submission deadline (date and time) and the platform's time zone.
- ☐ Point 4. I have checked whether there is a mandatory response framework, a page limit or a required file format.
- ☐ Point 5. I have identified mandatory site visits, whether variants are allowed or forbidden, and any optional additional services.
2. Structure
- ☐ Point 6. The outline follows the order of the criteria and sub-criteria in the tender rules, or the mandatory response framework.
- ☐ Point 7. Each heading uses the wording of the tender rules, so the evaluator finds every point without searching.
- ☐ Point 8. The length of each section is proportional to the weight of the corresponding sub-criterion.
- ☐ Point 9. The table of contents is up to date and the page numbering works.
3. Content
- ☐ Point 10. Every requirement in the technical specifications gets an explicit answer in the proposal.
- ☐ Point 11. The methodology talks about the buyer's site, project or service, not a general case.
- ☐ Point 12. Human resources are named, with their role, qualifications and availability.
- ☐ Point 13. The equipment mentioned exists and will actually be assigned to the contract.
- ☐ Point 14. The schedule is consistent with the deadlines in the administrative clauses and the constraints in the technical specifications.
- ☐ Point 15. Environmental and social commitments are concrete and verifiable, especially if they are scored.
- ☐ Point 16. The hours, quantities or headcounts stated are identical to those in the price offer.
4. Evidence
- ☐ Point 17. The references cited are close to the subject of the contract, recent and verifiable (client, date, amount).
- ☐ Point 18. The certifications, qualifications and labels mentioned are valid, with the supporting documents requested.
- ☐ Point 19. The CVs, product sheets or technical data sheets requested are attached and match the text.
- ☐ Point 20. No information is invented or overstated: everything written can be proven during evaluation or delivery.
5. Form
- ☐ Point 21. The buyer's name, the subject of the contract and the lot number are correct throughout, with no leftovers from an old proposal.
- ☐ Point 22. The text has been proofread by a second person: typos, sentences that are too long, internal jargon.
- ☐ Point 23. Diagrams, photos and tables are legible, captioned and useful for scoring.
6. Submission
- ☐ Point 24. Files are in the required format, clearly named and under the maximum size accepted by the platform.
- ☐ Point 25. The bid is submitted with a safety margin before the deadline, and the acknowledgement of receipt is kept.
How to use this checklist
Run through it at two moments: when you open the file for points 1 to 5, and the day before submission for everything else. Points 10 and 16 are easy to miss when several people write the proposal. Point 21 is the most costly for your image: a former client's name left in a proposal reads as copy-paste.
If you respond regularly, turn this list into an internal template and add the points specific to your trade.
What a tool can check for you
Several points on this list mainly take time: noting the criteria, aligning the outline, finding each requirement of the technical specifications in the text. Explain Response, the AI agent that writes the technical proposal directly in Word, reads the tender documents, flags points of attention and award criteria, proposes an outline aligned with the tender rules and checks that every requirement in the technical specifications is answered. The points on evidence, consistency with the price offer and submission remain under your control.
Frequently asked questions
When should you run the checklist?
When you open the file for reading the tender documents, then the day before submission for structure, content, evidence, form and submission.
Does this checklist apply to every sector?
Yes for the 25 basic points. Each trade adds its own points.
What if the tender rules impose a response framework?
Follow it to the letter, in the same order and with the same headings. Point 6 of the checklist then applies to the mandatory framework.
Save time on your next proposal
See Explain Response on one of your tenders, in 30 minutes, with an expert from your sector. Book a demo.