The ESPD explained: the European Single Procurement Document

Declare first, prove later: how the ESPD works, its six parts, national versions across the EU, and why the UK replaced it with the PSQ.

The Explain team

November 24, 2026

4 min

The ESPD explained: the European Single Procurement Document

In short: the European Single Procurement Document (ESPD) is a standard self-declaration used across the EU. It lets you apply for a public contract by declaring that you meet the requirements, without providing the evidence straight away; only the successful bidder provides it later. It has national names: DUME in France, DEUC in Spain, DGUE in Italy. The UK no longer uses it in England, Wales and Northern Ireland, where the PSQ has replaced it. For a UK company bidding in the EU, it is the first document to master.

The principle: declare first, prove later

The ESPD was created by the 2014 directives, and its standard form by Implementing Regulation (EU) 2016/7. At application stage, it replaces the pile of certificates suppliers used to attach to every bid. In it, you declare:

  • that no exclusion ground applies to you (convictions, unpaid taxes or social contributions, insolvency, grave professional misconduct, and so on);
  • that you meet the buyer's selection criteria: suitability to pursue the activity, economic and financial standing, technical and professional ability;
  • where relevant, which other entities you rely on (subcontractors, consortium members, the capacity of a third party).

The buyer asks for evidence only from the bidder it intends to award the contract to, or at any time if needed for the proper conduct of the procedure. It cannot ask for documents it can already access free of charge in a national database.

How it is structured

  1. Information on the procedure, completed by the buyer.
  2. Information on the economic operator: identity, representatives, reliance on other entities, subcontracting.
  3. Exclusion grounds.
  4. Selection criteria.
  5. Reduction of the number of candidates, in multi-stage procedures.
  6. Concluding statements and signature.

Buyers may let bidders answer Part IV with a single global statement that all selection criteria are met. Many do, to keep the file light.

An electronic form

Since 2018, the ESPD must be provided in electronic form in EU procedures. The Commission's free online service closed in 2019: national services and e-procurement platforms now provide it, based on a common data model, the ESPD-EDM, maintained by the EU Publications Office.

In practice, the buyer often provides a "buyer ESPD" prepared for its tender, as an XML file. You import it, complete it, export it and attach it to your application. Keep an up-to-date master version: you will only need to adapt it for each procedure.

National versions

  • France, DUME. It can be used instead of the French DC1 and DC2 forms, which remain available: the choice is the bidder's. Buyers must accept it whatever the contract value. The State's DUME service is available through Chorus Pro and built into many buyer platforms.
  • Spain, DEUC. As a rule, the self-declaration model included in the tender documents follows the DEUC format, whatever the contract value. The simplified open procedure uses its own declaration.
  • Italy, DGUE. It is completed electronically on the contracting authority's platform and linked to the economic operator's virtual file (FVOE), which the authority uses to check declarations.
  • United Kingdom. Under the Procurement Act 2023, England, Wales and Northern Ireland use the procurement specific questionnaire (PSQ) and the Central Digital Platform instead. Scotland still uses its Single Procurement Document.

Common mistakes

  • Declaring capabilities you cannot evidence within the deadline, often a few days.
  • Forgetting the ESPD of consortium members or entities you rely on: each must provide one.
  • Submitting a generic ESPD that ignores the tender's criteria.
  • Leaving outdated information: a new director, a change of address, last year's turnover.
  • Not having the evidence ready once selected: company register extract, tax and social security certificates, insurance, references.

What comes next

The EU Public Procurement Act proposed on 9 September 2026 aims to go further with a "once-only" principle: evidence shared once, then checked automatically, instead of being uploaded for every tender. The ESPD is the first step. Read our article on the EU procurement reform and our guide to the UK PSQ.

The ESPD gets you into the competition; the quality response wins it. Explain Response is an AI agent that works inside Microsoft Word: it reads the tender documents, builds a structure that follows the buyer's questions and drafts a first version from your own references and past bids, which your team then reviews and completes. Your data is hosted in France and never used to train a model. Book a 30-minute demo on a real tender.

Get our insights every month

Public procurement decoded: trends, methods and product news.

Get in touch
Let's talk

See how Explain handles your tenders.

A 30-minute demo on your real tenders, with an expert who knows your sector.