Article
Nine weighted criteria, a 0 to 3 scale and an example threshold to decide quickly and consistently whether to respond to a tender.

In short: responding to a tender takes time, often that of the best people on the team. A Go / No Go grid lets you decide quickly and consistently, instead of responding to everything or deciding on gut feeling. Here is a free grid of nine criteria, with indicative weightings, a 0 to 3 scale, a scoring method and an example decision threshold to adapt to your company.
Without a grid, the decision to respond depends on the mood of the moment, the week's workload or whoever opened the notice. A grid brings three things:
Before scoring, check the points that rule out responding, whatever the final score:
If any of these points is blocking, it is No Go. No need to go further.
Score each criterion from 0 to 3, then multiply by its weighting. The weightings below are indicative: adapt them to your strategy.
| Criterion | Indicative weighting | 0 | 1 | 2 | 3 |
|---|---|---|---|---|---|
| Fit with core business | 20% | Outside your trade | Related trade | Main trade, with some unusual services | Exact core business |
| Ability to mobilise resources | 15% | Resources unavailable | Resources to hire or rent | Resources available with adjustments | Resources available immediately |
| Comparable references | 15% | None | Distant or old references | One or two close references | Several close, recent references |
| Award criteria | 10% | Price very dominant, unfavourable | Price dominant | Balance of price and technical | Technical merit dominant, your strong point |
| Knowledge of the buyer | 10% | Unknown | Occasional contact | Already bid, analysis of previous contract known | Current or satisfied former client |
| Expected competition | 10% | Very well established incumbent | Strong competition | Normal competition | Weak competition or favourable position |
| Forecast profitability | 10% | Negative | Low | In line with your targets | Above your targets |
| Bid team workload | 5% | Team saturated | Heavy workload | Manageable workload | Team available |
| Contractual risks | 5% | Unacceptable penalties or clauses | High risks | Normal risks | Low risks |
For each criterion, multiply the score (0 to 3) by the weighting, add them up, then divide by 3 to get a score out of 100.
Score = (sum of scores × weightings) ÷ 3
Example: a tender scored 3 on business fit (20 × 3 = 60), 2 on resources (15 × 2 = 30), 2 on references (15 × 2 = 30), 1 on award criteria (10), 0 on knowledge of the buyer (0), 2 on competition (20), 2 on profitability (20), 1 on workload (5) and 2 on risks (10). Total: 185. Score: 185 ÷ 3, or about 62 out of 100.
The threshold depends on your win rate, your order book and your strategy. As an example only, to adapt:
In the example above, the score of 62 puts the tender in the discussion zone. Poor knowledge of the buyer and unfavourable criteria weigh on it: it is up to the team to judge whether it is worth the investment.
A good Go / No Go decision starts with two things: seeing the tender in time, and quickly understanding what it asks for.
It is the decision whether or not to respond to a tender, taken after a quick analysis of the tender documents against your capabilities, your chances and the expected profitability.
Enough to cover the trade, resources, chances of winning and profitability, but not so many that the grid becomes slow to fill in. Nine criteria, as here, is a good starting point.
No. It is an example. Set your threshold according to your win rate and workload, then adjust it with experience.
Partly, yes: reading the tender documents and identifying the criteria. Explain Response includes the analysis and the Go / No Go. The final decision remains the company's.
See Explain Response's analysis and Go / No Go on one of your tenders, in 30 minutes, with an expert from your sector. Book a demo.
Restez à la pointe de l'IA
Suivez-nous sur LinkedIn pour ne rien manquer des évolutions de l'IA dans les marchés publics.
Nous suivre