NewThe AI agent that writes your technical proposals directly in Word.Discover

Article

AI and technical proposals for digital and IT tenders: how to use it safely

Functional requirements, security, service levels: how to use AI for an IT technical proposal without promising what your solution cannot do.

The Explain team

October 12, 2026

6 min

AI and technical proposals for digital and IT tenders: how to use it safely

In brief: in digital and IT contracts, the public buyer assesses the solution, but also your ability to deploy it, maintain it and protect its data. The technical proposal must respond to functional and technical requirements that are often long and very precise. AI saves you time on reading the tender documents (DCE), structuring, drafting and above all compliance checking, provided it starts from your documentation, your CVs and your references. It must never invent a feature or a certification. With Explain Response, a first usable draft is ready in 30 minutes, in Word.

What the public buyer expects from an IT technical proposal

Whether the contract covers software, development services, managed services, maintenance, hardware or third-party application maintenance, the buyer is trying to reduce a risk: a project that goes off track, a service that stops, poorly protected data. The proposal must remove these doubts one by one.

Typical award criteria

  • Technical merit, often split into sub-criteria: functional coverage, architecture, security, reversibility, project methodology, change management support, service level.
  • Price, often assessed on an order scenario or a schedule of unit prices.
  • Environmental performance: digital sobriety, hosting, hardware lifespan, refurbishment. In France, since August 2026 and under the Climate and Resilience Act, every public contract must include at least one award criterion that takes account of the environmental characteristics of the bid.

Resources, methodology and service

The buyer wants to know the project team, the project manager, the profiles involved and their availability. It expects a clear method: scoping, configuration or development, acceptance testing, data migration, training, go-live, then maintenance and support. Service commitments are read closely: response times, service hours, escalation procedure, accepted penalties.

Security, data and CSR

Data hosting, GDPR compliance, access management, business continuity plan, reversibility at the end of the contract: these points are decisive in the public sector. On CSR, the buyer looks at the environmental impact of the solution, digital accessibility and your social commitments.

Where AI really saves time

An IT DCE often includes technical specifications (CCTP) running to several dozen pages and a response template or requirements grid to be filled in line by line. The main risk is not poor writing, it is missing a requirement.

1. Reading the tender documents

AI reads the consultation rules (RC), the CCTP, the appendices and the response template, then surfaces the criteria, mandatory requirements, technical prerequisites, hosting constraints and key risks. You quickly see whether your solution meets the need.

2. Structuring the proposal

When the buyer imposes a response template, you must follow it to the letter. Otherwise, the outline should follow the sub-criteria in the RC. Explain Response proposes an outline aligned with the consultation rules.

3. Drafting from your documents

Your product documentation, architecture documents, security policies, CVs, certifications and references are the foundation. Explain Response drafts each section from the CCTP and these documents, describing what your solution really does, applied to the buyer's context.

4. Checking the requirements

This is often the clearest gain in IT. Explain Response checks that every CCTP requirement is answered in the proposal and flags any that remain unanswered.

What AI must not do

  • Invent a feature. A feature that is promised and missing at acceptance testing means a dispute during delivery. If your solution does not meet a requirement, it is better to say so and propose an alternative.
  • Invent a certification or a hosting arrangement. Security certifications and data location can be checked.
  • Invent references or profiles. Every client cited and every CV must be real.
  • Copy a generic proposal. A sales presentation of your product does not answer a CCTP. The buyer expects answers to its requirements, in its order.

A general-purpose assistant used on its own does not know your solution and tends to say "yes" to everything. A specialised AI starts from your documentation and shows you the requirements it could not cover.

Without AI or with Explain Response: step by step

StepWithout AIWith Explain Response
Reading the DCEReading the CCTP and appendices, noting requirements by hand in a spreadsheetKey risks and award criteria identified automatically, for you to validate
Go / No GoDecision made on a quick read, for lack of timeDCE analysis and Go / No Go support included
Proposal outlineReused from an old proposal or a product presentationProposed outline, aligned with the criteria in the consultation rules
DraftingCopy-pasting documentation and adapting it by hand, over several daysFirst usable draft in 30 minutes, written from the CCTP and your documents
CheckingTicking off requirements by hand, line by lineCheck that every CCTP requirement is answered
FinalisationFormatting in WordEverything already happens in Word: you review, complete and submit

The digital sector guide

For the detailed structure of an IT proposal and what buyers expect, see our digital technical proposal guide (in French). If you also bid for training or consulting contracts, see the training and consulting guides. All the guides are on the technical proposal guides page.

Frequently asked questions

Can AI be used to respond to an IT tender?

Yes, if the AI relies on your documentation, your CVs and your references, and if your pre-sales team reviews it. The risk comes from a tool that claims features you do not have.

Can AI fill in a requirements grid?

Explain Response checks that every CCTP requirement is answered in the proposal. For a grid in a mandatory format, the final response still needs to be validated by your teams, requirement by requirement.

How long does an IT proposal take with Explain Response?

A first usable draft is ready in 30 minutes instead of several days. Review time then depends on the volume of requirements.

Where is my data hosted?

In France. It is never used to train a model. See pricing.

See Explain Response on an IT tender

An expert shows you the tool in 30 minutes on a real tender from your sector. Book a demo.

Get our insights every month

Public procurement decoded: trends, methods and product news.

Get in touch
Let's talk

See how Explain handles your tenders.

A 30-minute demo on your real tenders, with an expert who knows your sector.