A company bidding for public contracts in France, Spain, Italy and the United Kingdom writes the same document each time: the part of the tender that explains how it will deliver the contract. In the UK, these are the quality responses. But the name, the weight in the score, the way it is assessed and the traps to avoid change from one country to the next. This comparison brings together, point by point, what you need to know before bidding in these four countries.
One document, four names
- France: the mémoire technique, sometimes required in a set template called a cadre de réponse technique.
- Spain: the memoria técnica, submitted in the envelope for criteria assessed by judgement.
- Italy: the offerta tecnica, built around the relazione tecnica.
- United Kingdom: the quality responses, that is, the answers to the quality questions in the tender.
The legal framework
- France: the Public Procurement Code (Code de la commande publique).
- Spain: Law 9/2017 on Public Sector Contracts (LCSP).
- Italy: the Public Contracts Code, Legislative Decree 36/2023, amended at the end of 2024.
- United Kingdom: the Procurement Act 2023, in force since 24 February 2025 in England, Wales and Northern Ireland; Scotland keeps its own rules.
The three EU countries transpose the 2014 EU procurement directives. The UK now has its own regime, built on similar principles.
Where to find tenders
- France: BOAMP, the Official Journal of the EU (TED) above the thresholds, and buyer profiles, including PLACE for central government.
- Spain: the Plataforma de Contratación del Sector Público and the regional platforms, plus TED above the thresholds.
- Italy: ANAC's national public contracts database and the buyers' certified e-procurement platforms, plus TED above the thresholds.
- United Kingdom: Find a Tender, the central platform where every authority publishes its notices and where suppliers register.
How much the technical part is worth
- France: the code sets no minimum weighting. In service and works contracts, technical merit often weighs as much as price, or more, depending on the tender rules.
- Spain: the law sets the best price-quality ratio as the general rule, with several award criteria. For Annex IV services and intellectual services, quality criteria must represent at least 51% of the points.
- Italy: under the most economically advantageous tender, the technical offer often carries 70 or 80 points out of 100. For labour-intensive contracts, the buyer must cap the price score at no more than 30% of the total.
- United Kingdom: quality often outweighs price in services. In central government procurements, social value currently accounts for at least 10% of the total score; for procurements launched from 1 January 2027, the minimum rises to 20% for contracts of £5 million or more.
Who assesses, and how
- France: the buyer's staff analyse the tenders against the published criteria and sub-criteria and write an assessment report. In French local authorities, the tender committee (CAO) chooses the winner for contracts that reach the EU thresholds.
- Spain: the buyer's technical staff, or a committee of at least three experts when criteria assessed by judgement outweigh those scored by formula. A report justifies each score.
- Italy: an evaluation committee of experts in the field. It sets coefficients for the discretionary criteria, while tabular criteria earn fixed points depending on whether the tender meets them.
- United Kingdom: each evaluator often scores alone, on a published scale (for example 0 to 5), then the panel agrees a moderated score.
Format and limits
- France: the tender rules may set a page limit or a response template. Without a limit, the temptation to write too much is strong.
- Spain: page limits, font size and structure are often set in the administrative specifications. Extra pages may not be assessed.
- Italy: a maximum number of pages is very common, with a structure that mirrors the table of criteria.
- United Kingdom: a word or character limit per question is standard practice. Text beyond it is usually ignored.
The trap to avoid in each country
- France: the generic document copied from one tender to the next, and contradictions with the price breakdown.
- Spain: including in the memoria técnica anything that belongs in the envelope for criteria scored by formula, such as the price. This can lead to exclusion, because it reveals information that should only be known after the judgement-based assessment.
- Italy: the same risk: any economic element in the technical envelope can lead to exclusion.
- United Kingdom: leaving out a sub-question. Each missing element caps the score, however good the rest is.
Minimum quality scores
In Spain, Italy and often in the UK, the tender may set a minimum technical score: below it, the tender is rejected before the price is even considered. In France, the mechanism exists when the tender rules provide for it, but it is less common.
After award: what you can learn
- France: the rejection letter gives the reasons, and you can ask for the characteristics and advantages of the winning tender. The standstill before signature is 11 days in formal procedures.
- Spain: the award notification is reasoned, and the technical assessment report can be consulted. The special appeal suspends signature.
- Italy: the winning tender, the minutes and the procedure documents are made available to the other bidders on the platform, except for redacted parts. Above the EU thresholds, the contract is normally not signed before 32 days.
- United Kingdom: every assessed bidder receives an assessment summary with its scores, those of the winning tender and the reasons. Signature cannot take place until at least 8 working days of standstill have passed.
What works everywhere
- Follow the exact order and titles of the criteria.
- Write for this specific contract: sites, volumes, constraints, timetable.
- Prove every claim: named team, method, references, figures.
- Respect the format limits and allocate space according to the weightings.
- Only promise what you will deliver: the technical part is often a contract document.
- Use the feedback from each procurement to improve the next one.
To go further country by country, read our guides for the United Kingdom, Spain (in Spanish) and Italy (in Italian), as well as our European public procurement glossary.
In all four countries, the technical part takes the most time. Explain Response is an AI agent that works inside Microsoft Word: it reads the tender documents, proposes a structure that follows the criteria and drafts a first version from your own references and past bids, which your team reviews and completes. Your data is hosted in France and never used to train a model. Book a 30-minute demo on a real tender.