NewThe AI agent that writes your technical proposals directly in Word.Discover

Construction · Water & wastewater

The AI agent that speaks drinking water, wastewater and wet utilities

Drinking water networks, wastewater, treatment plants and water cycle infrastructure in public procurement.

Sector tender monitoring
A+
New tender detected
Published 2 h ago · high relevance
GO
More than 250 companies already use Explain, from SMEs to large groups.
VEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTSVEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTS
02 · The sector in figures
  • ≈ €5.3bn per year of public procurement in water cycle contracts in France (≈ €7bn including public service concessions, DSP)
  • ≈ €13bn/year estimated investment shortfall in drinking water and wastewater services
  • ≈ 51 million inhabitants served by the 550+ local authorities that are FNCCR members for water and wastewater
  • ≈ 60% of public contracts awarded to SMEs (by number), with works contracts often split into lots
03 · Your challenges

Bidding for public tenders, without losing your nights to it.

The three pain points companies in the sector run into.

01 · Detection

Spotting the right tenders

Water cycle contracts come from local authorities, water syndicates, municipal utilities and concession holders, spread across many platforms. Spotting pipe or treatment plant contracts (CPV 45232150 · 45232400) in your area, at the right value, against a backdrop of growing investment needs, requires rigorous and constant monitoring.

02 · Analysis

Decoding the tender documents

A water tender pack combines technical specifications (CCTP), network plans, a geotechnical study, health requirements (ACS) and a detailed bill of quantities (DQE). Tracking down the referenced CCTG fascicules (70, 71), laying and testing requirements (NF EN 805 / 1610), and continuity of service and network crossing constraints takes significant expertise and time on every bid.

03 · Response

Writing the technical proposal

The technical proposal must demonstrate mastery of pipe laying, pressure and leak-tightness testing, disinfection of drinking water mains, continuity of service, and safety in trenches and confined spaces. For each tender, the methodology has to be adapted to the type of network and the operating context.

04 · How it works

From contract notice to signed proposal.

Three steps, one agent, no extra tool to open.

01Detect

Detect

Explain monitors the BOAMP (French official public procurement bulletin), legal notice journals, buyer profiles and e-procurement platforms, and surfaces relevant water cycle contracts (CPV 45232150 · 45232400 · 45252100 · 90490000): local authorities, water syndicates, municipal utilities and concession holders in your area, at the right value and with the right contract form, with real-time alerts, ahead of your competitors.

BOAMPJOUEPLACETerritories
02Analyse

Analyse

The AI produces a summary of the tender documents: type of networks or structures, referenced CCTG fascicules (70, 71), laying and testing requirements (NF EN 805 / 1610), health requirements (ACS), continuity of service and award criteria.

CCTPCriteriaBPUStandards
03Respond

Respond

The agent drafts a first version of the technical proposal (laying and testing methodology, drinking water disinfection, continuity of service management, trench safety, environmental approach) built on your references. Pricing and technical choices remain with your teams.

Word add-inTechnical proposalQSE
Explain · from tender to proposal
A+
Tender detected · high relevance
Targeted CPV · published 2 h ago
Detect
B
Requirements extracted from the CCTP
Standards, award criteria, deadlines
Analyse
✓
Technical proposal generated
First draft ready in Word
Respond
05 · What Explain covers

The sector's entire scope, covered.

  • Subject: Renewal of drinking water and wastewater networks
  • Lots: Water supply pipes · foul and surface water networks · service connections · ancillary structures
  • Form: Framework agreement with purchase orders · 4 years · CCAG Travaux (French general terms for works contracts)
  • Standards: CCTG Fascicules 70 & 71 · NF EN 805 · NF EN 1610
06 · Winning the contract

What the buyer assesses, and what gets you eliminated.

Read the full technical proposal guide for this sector (in French)
✓What the buyer assesses
  • Technical value (≈ 40 to 60%): laying and testing methodology, drinking water disinfection, continuity of service management, safety in trenches and confined spaces, phasing.
  • Price (≈ 40 to 50%): consistency of the DQE, unit prices, no abnormally low bid.
  • Compliance & environment: CCTG Fascicules 70 / 71, NF EN 805 / 1610, ACS certificate for materials, spoil management.
✕Mistakes that disqualify you
  • Missing ACS certificate: materials in contact with drinking water lack the required health compliance certificate.
  • Tests or fascicules not addressed: required pressure and leak-tightness tests (NF EN 805 / 1610) or Fascicules 70 / 71 not taken into account.
  • DT-DICT receipts ignored: crossings with existing networks not addressed, in breach of French anti-damage regulations.
07 · They bid with Explain

What companies in the sector using Explain say.

Portrait · coming soon
“

“After these first few months of use, we can already say that 6 or 7 projects have come to fruition thanks to Explain.”

Stéphanie Audinel
Managing Director · Citeos
08 · Sector questions

Frequently asked questions.

Are water contracts often renewal framework agreements?

Increasingly so. With ageing networks, local authorities are awarding multi-year framework agreements for pipe renewal. Explain identifies the contract form and expiry date so you can target recurring volumes in your area.

Does Explain take drinking water health requirements into account?

Yes. The agent highlights the ACS (Health Compliance Certificate) requirements for materials in contact with water, as well as the disinfection and testing procedures referenced in the technical specifications, CCTP (NF EN 805 / 1610), all useful for your technical proposal.

How does Explain handle CCTG Fascicules 70 and 71 and the required tests?

The agent identifies the fascicules referenced in the tender documents, DCE (Fascicule 71 for drinking water networks, Fascicule 70 for wastewater) and sets out the required pressure and leak-tightness tests (NF EN 805, NF EN 1610), drinking water disinfection procedures and laying constraints, ready to include in the technical proposal.

Does Explain include continuity of service and DT-DICT in its analysis?

Yes. It highlights requirements for continuity of supply, bypasses and maintaining service, as well as DT-DICT obligations (French pre-works utility declarations) relating to existing networks and crossings, which are key to the methodology and trench safety.

Does Explain size the structures for us?

No. It detects tenders, analyses the tender documents and drafts the first version of the technical proposal. Hydraulic sizing, quantity surveying and technical choices remain with your teams.

Let's talk

30 minutes on your water cycle contracts

See how Explain detects your water and wastewater tenders, breaks down the technical specifications and drafts the first version of your technical proposal, on a real tender from your sector, in 30 minutes.

Reply within 24 h