NewThe AI agent that writes your technical proposals directly in Word.Discover

Construction · Energy & utilities

The AI agent that speaks energy networks, HVAC and solar PV

Electrical networks, public lighting, HVAC, solar PV and utilities in public works and installation contracts.

Sector tender monitoring
A+
New tender detected
Published 2 h ago · high relevance
GO
More than 250 companies already use Explain, from SMEs to large groups.
VEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTSVEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTS
02 · The sector in figures
  • ≈ €15bn electrical, HVAC and plumbing distribution market in France (2025)
  • ≈ 24.3 GW of installed solar PV capacity at the end of 2024, with a target of 35 to 44 GW by 2028
  • ≈ 3.5 GW/year of solar capacity connected in recent years, partly awarded through CRE tenders (French energy regulator, PPE2)
  • ≈ 60% of public contracts awarded to SMEs (by number), with works contracts often split into lots
03 · Your challenges

Bidding for public tenders, without losing your nights to it.

The three pain points companies in the sector run into.

01 · Detection

Spotting the right tenders

Energy contracts are split between installation works, global contracts, CRE tenders and energy performance contracts, issued by municipalities, social housing providers, hospitals and semi-public companies (SEM). Spotting the right contracts (CPV 45315000 · 09332000) in your area, while distinguishing works from supplies, requires detailed and sustained monitoring.

02 · Analysis

Decoding the tender documents

An energy tender pack combines technical specifications (CCTP), electrical diagrams, thermal calculation notes, grid connection requirements and a dense bill of quantities (DQE). Tracking down the referenced standards (NF C 15-100, UTE C 15-712, NF EN 12831), Enedis grid connection constraints, performance requirements and weighted criteria calls for specialist expertise on every bid.

03 · Response

Writing the technical proposal

The technical proposal must evidence electrical authorisations (NF C 18-510) and qualifications (QUALIFELEC, QUALIPV), as well as mastery of grid connection, commissioning (Consuel) and energy performance commitments. For each tender, the template has to be adapted to the technology and the operating context.

04 · How it works

From contract notice to signed proposal.

Three steps, one agent, no extra tool to open.

01Detect

Detect

Explain monitors the BOAMP (French official public procurement bulletin), legal notice journals, buyer profiles and e-procurement platforms, and surfaces relevant energy and utilities contracts (CPV 45315000 · 45331000 · 09332000 · 09300000): municipalities, social housing providers, hospitals and semi-public companies (SEM) in your area, distinguishing works, supplies and performance contracts, with real-time alerts, ahead of your competitors.

BOAMPJOUEPLACETerritories
02Analyse

Analyse

The AI produces a summary of the tender documents: type of installation, referenced standards (NF C 15-100, UTE C 15-712, NF EN 12831), grid connection constraints, energy performance requirements and award criteria.

CCTPCriteriaBPUStandards
03Respond

Respond

The agent drafts a first version of the technical proposal (installation and grid connection methodology, commissioning, qualifications and authorisations, performance commitments, environmental approach) built on your references. Sizing and technical choices remain with your teams.

Word add-inTechnical proposalQSE
Explain · from tender to proposal
A+
Tender detected · high relevance
Targeted CPV · published 2 h ago
Detect
B
Requirements extracted from the CCTP
Standards, award criteria, deadlines
Analyse
✓
Technical proposal generated
First draft ready in Word
Respond
05 · What Explain covers

The sector's entire scope, covered.

  • Subject: Installation of solar carports on a public car park
  • Lots: Civil engineering & structure · electrical work & grid connection · PV modules · monitoring
  • Form: Works contract (or global contract) · 12 months · CCAG Travaux (French general terms for works contracts)
  • Standards: NF C 15-100 · NF C 18-510 · UTE C 15-712 · NF EN 12831
06 · Winning the contract

What the buyer assesses, and what gets you eliminated.

Read the full technical proposal guide for this sector (in French)
✓What the buyer assesses
  • Technical value (≈ 40 to 60%): installation and grid connection methodology, network phasing, commissioning (Consuel), qualifications and authorisations, performance commitments.
  • Price (≈ 40 to 50%): consistency of the DQE, unit prices, no abnormally low bid.
  • Compliance & environment: NF C 15-100 (LV), UTE C 15-712 (PV), NF EN 12831 (HVAC), QUALIFELEC / RGE, environmental approach.
✕Mistakes that disqualify you
  • Missing qualification or authorisation: required QUALIFELEC, QUALIPV or RGE not evidenced, or electrical authorisations (under NF C 18-510) missing.
  • Standards not addressed: NF C 15-100, UTE C 15-712 or NF EN 12831 required by the CCTP not taken into account.
  • Grid connection or commissioning not addressed: Enedis grid connection constraints or Consuel certificate missing, inconsistent DQE.
07 · They bid with Explain

What companies in the sector using Explain say.

Portrait · coming soon
“

“We need to know our territories inside out, and that is exactly what Explain's software enables us to do.”

Vincent Larribe
Business Development Director · Reden
08 · Sector questions

Frequently asked questions.

Can Explain tell a works contract from an energy performance contract?

Yes. The agent identifies the nature and form of the contract (works, global contract, energy performance contract, CRE tender) and highlights the expected performance commitments, which are key to calibrating your technical proposal.

Does Explain recognise the qualifications required for energy lots?

Yes. It highlights the qualifications and certifications expected (QUALIFELEC, QUALIPV / QualiPAC, OPQIBI, RGE label, NF C 18-510 electrical authorisations) so you can check your eligibility before bidding.

How does Explain handle the electrical and photovoltaic standards referenced in the CCTP?

The agent identifies the standards required by the technical specifications (NF C 15-100 for low-voltage installations, the UTE C 15-712 guide for photovoltaics, NF EN 12831 for HVAC sizing, NF EN 13201 for public lighting) and sets out the associated requirements, ready to structure your technical proposal.

Does Explain include grid connection and commissioning in its analysis?

Yes. It highlights grid connection constraints (Enedis, the French distribution network operator), commissioning requirements (Consuel certificate), electrical authorisations (NF C 18-510) and, where relevant, EV charging points or public lighting, so your methodology covers the whole chain through to operation.

Does Explain size the installation for us?

No. It detects tenders, analyses the tender documents (DCE) and drafts the first version of the technical proposal. Sizing, calculation notes and technical choices remain with your teams.

Let's talk

30 minutes on your energy contracts

See how Explain detects your energy, HVAC and solar PV tenders, breaks down the technical specifications and drafts the first version of your technical proposal, on a real tender from your sector, in 30 minutes.

Reply within 24 h