NewThe AI agent that writes your technical proposals directly in Word.Discover

Construction · Civil engineering & structures

The AI agent that speaks engineering structures, bridges and civil engineering

Bridges, viaducts, tunnels, footbridges and major civil engineering structures for public infrastructure contracts.

Sector tender monitoring
A+
New tender detected
Published 2 h ago · high relevance
GO
More than 250 companies already use Explain, from SMEs to large groups.
VEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTSVEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTS
02 · The sector in figures
  • ≈ €3.5bn annual turnover of engineering structures contractors in France (2024)
  • ≈ 250,000 bridges in France, 120,000 of them managed by municipalities and inter-municipal bodies
  • Over €51bn of public works ordered each year in France, ≈ 40% of it by local authorities
  • ≈ 60% of public contracts awarded to SMEs (by number), with works contracts often split into lots
03 · Your challenges

Bidding for public tenders, without losing your nights to it.

The three pain points companies in the sector run into.

01 · Detection

Spotting the right tenders

Engineering structures contracts come from a wide range of project owners (DIR regional road directorates, departmental councils, metropolitan authorities, SNCF Réseau, VNF) on separate platforms. Detecting bridge and structure contracts (CPV 45221000) in your area as early as possible, at the right thresholds, requires sustained monitoring that few teams can keep up.

02 · Analysis

Decoding the tender documents

An engineering structure DCE (tender documents) combines technical specifications (CCTP), structural calculations, formwork and reinforcement drawings, geotechnical data and a dense lump-sum price breakdown (DPGF). Finding the referenced CCTG fascicules (65, 4, 62), concrete exposure classes, phasing constraints and site constraints takes considerable expertise and time.

03 · Response

Writing the technical proposal

A bridge technical proposal must demonstrate mastery of the construction method (incremental launching, balanced cantilever, falsework), concreting and prestressing phasing, safety when working at height and operating constraints under live traffic. Every structure is unique: the framework cannot be recycled.

04 · How it works

From contract notice to signed proposal.

Three steps, one agent, no extra tool to open.

01Detect

Detect

Explain monitors the BOAMP (France's official public procurement bulletin), legal notice publications, buyer profiles and e-procurement platforms, and surfaces relevant civil engineering and engineering structures contracts (CPV 45221000 · 45221100 · 45221110 · 45262300): DIRs, departmental councils, metropolitan authorities, SNCF Réseau and VNF in your area, at the right value, with real-time alerts, ahead of your competitors.

BOAMPJOUEPLACETerritories
02Analyse

Analyse

The AI delivers a summary of the DCE: type of structure, referenced CCTG fascicules (65, 4, 62), applicable Eurocodes, exposure classes, phasing, site constraints and award criteria.

CCTPCriteriaBPUStandards
03Respond

Respond

The agent drafts a first version of the technical proposal: construction method, concreting and prestressing phasing, resources (cranes, falsework, crews), QHSE and environmental approach, based on your structure references. Structural calculations and technical choices stay with your teams.

Word add-inTechnical proposalQSE
Explain · from tender to proposal
A+
Tender detected · high relevance
Targeted CPV · published 2 h ago
Detect
B
Requirements extracted from the CCTP
Standards, award criteria, deadlines
Analyse
✓
Technical proposal generated
First draft ready in Word
Respond
05 · What Explain covers

The sector's entire scope, covered.

  • Subject: Construction of a prestressed concrete road bridge
  • Lots: Deep foundations · piers · deck · structure equipment
  • Form: Works contract · 24 months · CCAG Travaux (general administrative terms for works)
  • Standards: CCTG fascicules 65 & 4 · Eurocodes 2 / 3 / 8
06 · Winning the contract

What the buyer assesses, and what gets you eliminated.

Read the full technical proposal guide for this sector (in French)
✓What the buyer assesses
  • Technical merit (≈ 50 to 60%): construction method (incremental launching, balanced cantilever, falsework), concreting and prestressing phasing, resources (cranes, falsework), safety when working at height.
  • Price (≈ 30 to 40%): consistency of the lump-sum price breakdown (DPGF), no abnormally low bid.
  • Compliance & inspections: CCTG fascicules 65 / 62, Eurocodes 2/3/8, EN 206 / 1090, exposure classes and inspection tests.
✕Mistakes that disqualify you
  • Inconsistent construction method: phasing or resources unsuited to site constraints, incompatible with the execution requirements of fascicule 65.
  • Standards or classes not addressed: Eurocodes, NF EN 206 (concrete exposure classes) or required inspection tests not taken into account.
  • Missing qualification or document: required QUALIBAT engineering structures qualification, quality assurance plan (PAQ) or inspection notes missing.
07 · They bid with Explain

What companies in the sector using Explain say.

Portrait · coming soon
“

“After these first few months of use, we can already say that 6 or 7 projects have been won thanks to Explain.”

Stéphanie Audinel
Company Director · Citeos
08 · Sector questions

Frequently asked questions.

Does Explain know the CCTG fascicules specific to engineering structures?

Yes. The agent recognises the fascicules referenced in the tender documents (fascicule 65 for concrete, fascicule 4 for steel, fascicule 62 for calculation rules) and the applicable Eurocodes, and brings them into the summary and the technical proposal.

Are engineering structures contracts about repair or new builds?

Both. With an ageing asset base (≈ 250,000 bridges in France), a growing share of contracts concerns strengthening and repair. Explain distinguishes new-build contracts from rehabilitation contracts so you can target those you are qualified for.

How does Explain handle the phasing and construction methods of an engineering structure?

The agent sets out the concreting and prestressing phasing, site constraints (traffic maintained, crossing a road or waterway) and the expected construction method (incremental launching, balanced cantilever, falsework), so your technical proposal builds on a framework already aligned with the DCE.

Does Explain cover Eurocodes and the required inspection tests?

Yes. It surfaces the applicable Eurocodes (2, 3, 8), concrete exposure classes (NF EN 206), steel execution requirements (NF EN 1090) and the mandatory tests and inspections, all key to the compliance of your bid.

Does Explain produce structural calculations for us?

No. It detects tenders, analyses the tender documents (DCE) and drafts the first version of the technical proposal. Sizing, structural calculations and technical choices stay with your teams.

Let's talk

30 minutes with an infrastructure tender expert

See how Explain detects your engineering structures tenders, breaks down the CCTP and drafts the first version of your technical proposal, on a real DCE from your sector, in 30 minutes.

Reply within 24 h