NewThe AI agent that writes your technical proposals directly in Word.Discover

Construction · Structural works

The AI agent that speaks reinforced concrete, structures and works contracts

Foundations, reinforced concrete, masonry and structural frame for public works contracts.

Sector tender monitoring
A+
New tender detected
Published 2 h ago · high relevance
GO
More than 250 companies already use Explain, from SMEs to large groups.
VEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTSVEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTS
02 · The sector in figures
  • ≈ €215bn of building works carried out each year in France, with structural works forming the backbone
  • Over 50,000 public building works contracts published each year in France
  • 40% of public contracts in France relate to construction
  • ≈ 60% of public contracts awarded to SMEs (by number), with works contracts often split into lots
03 · Your challenges

Bidding for public tenders, without losing your nights to it.

The three pain points companies in the sector run into.

01 · Detection

Spotting the right tenders

Structural works contracts are scattered across buyer profiles, legal notice publications and e-procurement platforms. Spotting the right lots (CPV 45223000 · 45262000) in your area, at the right value, before your competitors, takes a huge amount of time.

02 · Analysis

Decoding the tender documents

A structural works DCE (tender documents) means a thick technical specification (CCTP), drawings, special administrative terms (CCAP), a schedule of prices and bill of quantities (BPU/DQE) and technical documents. Finding the cited standards (NF DTU, Eurocodes), the phasing, the penalties and the weighted criteria takes half a day per file.

03 · Response

Writing the technical proposal

The technical proposal must demonstrate mastery of phasing, resources (crane, formwork, wall shuttering), safety and environmental approach, and it has to be rewritten for every tender. Starting from a blank page is costly when submission deadlines are short.

04 · How it works

From contract notice to signed proposal.

Three steps, one agent, no extra tool to open.

01Detect

Detect

Explain monitors the BOAMP (France's official public procurement bulletin), legal notice publications, buyer profiles and e-procurement platforms, and surfaces relevant structural works contracts (CPV 45223000 · 45262000): public project owners, social housing landlords and local authorities in your area, at the right value, with real-time alerts, ahead of your competitors.

BOAMPJOUEPLACETerritories
02Analyse

Analyse

For each DCE, the AI delivers a summary: scope, lots, cited standards (NF DTU 13.x / 20.1 / 21, Eurocodes 2 & 8), phasing, penalties and award criteria.

CCTPCriteriaBPUStandards
03Respond

Respond

The agent drafts a first version of the structural works technical proposal: methodology, phasing, human and material resources, QHSE approach, based on your references. Your teams keep control of pricing and technical choices.

Word add-inTechnical proposalQSE
Explain · from tender to proposal
A+
Tender detected · high relevance
Targeted CPV · published 2 h ago
Detect
B
Requirements extracted from the CCTP
Standards, award criteria, deadlines
Analyse
✓
Technical proposal generated
First draft ready in Word
Respond
05 · What Explain covers

The sector's entire scope, covered.

  • Subject: Construction of a school complex: structural works lot
  • Lots: Foundations · reinforced concrete · masonry
  • Form: Works contract · 16 months · CCAG Travaux (general administrative terms for works)
  • Standards: NF DTU 13/21 · Eurocodes 2 & 8 · NF EN 206
06 · Winning the contract

What the buyer assesses, and what gets you eliminated.

Read the full technical proposal guide for this sector (in French)
✓What the buyer assesses
  • Technical merit (≈ 40 to 60% of the score): methodology, phasing, human and material resources, management of co-activity and interfaces.
  • Price (≈ 40 to 50%): consistency of the DQE/DPGF, credibility of unit prices, no abnormally low bid.
  • QHSE & environmental approach (often scored): safety (PPSPS health and safety plan), waste sorting and recovery, low-carbon concrete, limiting disturbance for local residents.
✕Mistakes that disqualify you
  • Overstated resources: staff or equipment the company does not have, cross-checked against your references and certificates.
  • DQE/DPGF incorrectly filled in: wrong quantities, missing lines or incorrect units. A frequent reason for rejection.
  • Missing mandatory document or standard: DTUs/Eurocodes not addressed, ten-year liability insurance (décennale), QUALIBAT qualification or quality assurance plan required by the CCAP missing.
07 · They bid with Explain

What companies in the sector using Explain say.

Portrait · coming soon
“

“After these first few months of use, we can already say that 6 or 7 projects have been won thanks to Explain.”

Stéphanie Audinel
Company Director · Citeos
08 · Sector questions

Frequently asked questions.

Does Explain understand the technical documents of a structural works contract?

Yes. The agent reads the technical specifications (CCTP), the special administrative terms (CCAP) and the schedule of prices and bill of quantities (BPU/DQE), recognises the CPV codes (45223000 · 45262000) and the trade standards (NF DTU 13.x / 20.1 / 21 / 23.1, Eurocodes 2 & 8, NF EN 206) and structures the technical proposal by lot.

Are structural works public contracts often split into lots?

Frequently: foundations, concrete structure, masonry and underpinning are often separate lots. Explain identifies how the contract is split and targets the lots where you are competitive.

How does Explain handle the phasing and site constraints expected in the technical proposal?

Based on the CCTP and the provisional schedule, the agent proposes a phasing framework (site set-up, earthworks, foundations, superstructure, demobilisation), the associated resources (crane, wall formwork, shuttering) and co-activity points, which your site managers then adjust.

Does Explain cover environmental requirements (construction waste, low-carbon concrete)?

Yes. The agent identifies the QHSE and environmental requirements in the DCE (waste sorting and recovery, low-carbon concrete, limiting disturbance) and prepares the corresponding section of the technical proposal, to be completed with your technical choices.

Does Explain price the contract for us?

No. Explain detects tenders, analyses the tender documents (DCE) and drafts the first version of the technical proposal. Quantity surveying, unit prices and construction choices remain in the hands of your estimating teams.

Let's talk

30 minutes with a works contracts expert

See how Explain detects your structural works tenders, breaks down the CCTP and drafts the first version of your technical proposal, on a real DCE from your sector, in 30 minutes.

Reply within 24 h