Construction · Structural works
Foundations, reinforced concrete, masonry and structural frame for public works contracts.
Structural works contracts are scattered across buyer profiles, legal notice publications and e-procurement platforms. Spotting the right lots (CPV 45223000 · 45262000) in your area, at the right value, before your competitors, takes a huge amount of time.
A structural works DCE (tender documents) means a thick technical specification (CCTP), drawings, special administrative terms (CCAP), a schedule of prices and bill of quantities (BPU/DQE) and technical documents. Finding the cited standards (NF DTU, Eurocodes), the phasing, the penalties and the weighted criteria takes half a day per file.
The technical proposal must demonstrate mastery of phasing, resources (crane, formwork, wall shuttering), safety and environmental approach, and it has to be rewritten for every tender. Starting from a blank page is costly when submission deadlines are short.
Explain monitors the BOAMP (France's official public procurement bulletin), legal notice publications, buyer profiles and e-procurement platforms, and surfaces relevant structural works contracts (CPV 45223000 · 45262000): public project owners, social housing landlords and local authorities in your area, at the right value, with real-time alerts, ahead of your competitors.
For each DCE, the AI delivers a summary: scope, lots, cited standards (NF DTU 13.x / 20.1 / 21, Eurocodes 2 & 8), phasing, penalties and award criteria.
The agent drafts a first version of the structural works technical proposal: methodology, phasing, human and material resources, QHSE approach, based on your references. Your teams keep control of pricing and technical choices.
“After these first few months of use, we can already say that 6 or 7 projects have been won thanks to Explain.”
Yes. The agent reads the technical specifications (CCTP), the special administrative terms (CCAP) and the schedule of prices and bill of quantities (BPU/DQE), recognises the CPV codes (45223000 · 45262000) and the trade standards (NF DTU 13.x / 20.1 / 21 / 23.1, Eurocodes 2 & 8, NF EN 206) and structures the technical proposal by lot.
Frequently: foundations, concrete structure, masonry and underpinning are often separate lots. Explain identifies how the contract is split and targets the lots where you are competitive.
Based on the CCTP and the provisional schedule, the agent proposes a phasing framework (site set-up, earthworks, foundations, superstructure, demobilisation), the associated resources (crane, wall formwork, shuttering) and co-activity points, which your site managers then adjust.
Yes. The agent identifies the QHSE and environmental requirements in the DCE (waste sorting and recovery, low-carbon concrete, limiting disturbance) and prepares the corresponding section of the technical proposal, to be completed with your technical choices.
No. Explain detects tenders, analyses the tender documents (DCE) and drafts the first version of the technical proposal. Quantity surveying, unit prices and construction choices remain in the hands of your estimating teams.
30 minutes with a works contracts expert
See how Explain detects your structural works tenders, breaks down the CCTP and drafts the first version of your technical proposal, on a real DCE from your sector, in 30 minutes.