NewThe AI agent that writes your technical proposals directly in Word.Discover

Construction · Energy-efficiency renovation

The AI agent that speaks energy-efficiency renovation for public buildings

Insulation, building envelope, equipment and deep renovation for public contracts on building energy performance.

Sector tender monitoring
A+
New tender detected
Published 2 h ago · high relevance
GO
More than 250 companies already use Explain, from SMEs to large groups.
VEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTSVEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTS
02 · The sector in figures
  • ≈ €15.1bn invested in energy-efficiency renovation in France (2024)
  • ≈ €31bn/year of investment needed by 2030 under the SNBC 3 trajectory (France's national low-carbon strategy)
  • 28% of French public procurement spent on works (OECP 2023 census)
  • ≈ 60% of public contracts awarded to SMEs (by number), with works contracts often split into lots
03 · Your challenges

Bidding for public tenders, without losing your nights to it.

The three pain points companies in the sector run into.

01 · Detection

Spotting the right tenders

Energy-efficiency renovation contracts are issued as separate works lots, global performance contracts or joint purchasing groups (ACTEE programmes, schools, care homes). Spotting the right contracts (CPV 45321000 · 45320000) in your area, and telling single-measure renovation apart from deep renovation, requires close monitoring of many public buyers.

02 · Analysis

Decoding the tender documents

An energy renovation DCE (tender documents) combines an energy audit, technical specifications (CCTP) per lot, savings scenarios, tertiary-sector decree requirements and sometimes an energy performance contract (CPE) framework with performance commitments. Finding the target performance levels, the NF DTU insulation standards, occupied-site constraints and the weighted award criteria (often heavily weighted towards technical and environmental merit) takes a considerable amount of time.

03 · Response

Writing the technical proposal

The technical proposal must prove the RGE label, mastery of the envelope and airtightness, performance commitments (CPE), management of works in occupied buildings and CEE eligibility. For every tender, the methodology and evidence of results have to be realigned with the project owner's scenario.

04 · How it works

From contract notice to signed proposal.

Three steps, one agent, no extra tool to open.

01Detect

Detect

Explain monitors the BOAMP (France's official public procurement bulletin), legal notice publications, buyer profiles and e-procurement platforms, and surfaces relevant energy-efficiency renovation contracts (CPV 45321000 · 45320000 · 09000000 · 71314300): local authorities, social housing landlords, schools and care homes in your area, distinguishing single-measure renovation, global performance contracts and joint purchasing groups, with real-time alerts, ahead of your competitors.

BOAMPJOUEPLACETerritories
02Analyse

Analyse

The AI delivers a summary of the DCE: renovation scope, target performance and tertiary-sector decree requirements, NF DTU insulation standards, whether there is a CPE with performance commitments, occupied-site constraints and award criteria.

CCTPCriteriaBPUStandards
03Respond

Respond

The agent drafts a first version of the technical proposal: methodology per lot, envelope and airtightness treatment, performance commitments, works in occupied buildings, and how to showcase the RGE label and CEE, drawing on your references. Savings calculations and technical choices stay with your teams.

Word add-inTechnical proposalQSE
Explain · from tender to proposal
A+
Tender detected · high relevance
Targeted CPV · published 2 h ago
Detect
B
Requirements extracted from the CCTP
Standards, award criteria, deadlines
Analyse
✓
Technical proposal generated
First draft ready in Word
Respond
05 · What Explain covers

The sector's entire scope, covered.

  • Subject: Deep energy renovation of a school complex
  • Lots: Envelope insulation · joinery · HVAC · ventilation
  • Form: Global performance contract (or works contract) · 18 months · CCAG Travaux (general administrative terms for works)
  • Standards: RE 2020 / tertiary-sector decree · NF DTU 45.x · NF EN 12831
06 · Winning the contract

What the buyer assesses, and what gets you eliminated.

Read the full technical proposal guide for this sector (in French)
✓What the buyer assesses
  • Technical merit (≈ 50 to 60%): methodology per lot, envelope and airtightness treatment, management of works in occupied buildings, resources.
  • Price (≈ 30 to 40%): consistency of the bill of quantities (DQE), no abnormally low bid.
  • Performance & qualification: performance commitments (CPE, tertiary-sector decree), RE 2020, NF DTU 45.x, EN 12831, RGE qualification and CEE eligibility.
✕Mistakes that disqualify you
  • No RGE label: required RGE qualification (CEE and subsidy eligibility) not held or not evidenced.
  • No performance commitment: CPE or tertiary-sector decree targets not covered, response limited to resources alone.
  • Airtightness not addressed: envelope mastery (NF DTU 45.x) and phasing in occupied buildings not described despite being required.
07 · They bid with Explain

What companies in the sector using Explain say.

Portrait · coming soon
“

“We need to know our territories inside out, and that's exactly what Explain's software lets us do.”

Vincent Larribe
Business Development Director · Reden
08 · Sector questions

Frequently asked questions.

Does Explain identify global energy performance contracts (CPE)?

Yes. The agent distinguishes standard works lots from global performance contracts and surfaces the expected performance commitments, which are key to steering your technical proposal towards results rather than resources alone.

Is the RGE label required for these contracts?

Very often, particularly for eligibility for subsidies and energy savings certificates (CEE). Explain surfaces the required qualifications (RGE label, QUALIBAT, OPQIBI) so you can check your eligibility before bidding.

How does Explain handle the tertiary-sector decree and performance obligations?

The agent identifies the targets linked to the Éco Énergie Tertiaire scheme (France's tertiary-sector decree), RE 2020 for associated new builds and the CPE performance commitments, and sets out the expected obligation of result, so your technical proposal focuses on performance rather than resources alone.

Does Explain cover NF DTU insulation standards and works in occupied buildings?

Yes. It surfaces the referenced DTUs (NF DTU 45.x for insulation, NF EN 12831 for heat loss), airtightness requirements and the constraints of working in occupied buildings (schools, care homes), all key to technical merit and feasibility.

Does Explain calculate energy savings for us?

No. It detects tenders, analyses the tender documents (DCE) and drafts the first version of the technical proposal. Savings calculations, quantity surveying and technical choices stay with your teams.

Let's talk

30 minutes on your energy-efficiency renovation tenders

See how Explain detects your energy-efficiency renovation tenders, breaks down the CCTP and drafts the first version of your performance-focused technical proposal, on a real DCE from your sector, in 30 minutes.

Reply within 24 h