NewThe AI agent that writes your technical proposals directly in Word.Discover

Construction · Finishing works

The AI agent that masters your finishes and interior fit-out lots

Plastering, joinery, painting, floor and wall coverings, partitions and suspended ceilings for public works contracts.

Sector tender monitoring
A+
New tender detected
Published 2 h ago · high relevance
GO
More than 250 companies already use Explain, from SMEs to large groups.
VEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTSVEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTS
02 · The sector in figures
  • ≈ €208bn building industry turnover in France (2024), with finishing works as the largest contributor
  • ≈ €11bn for painting works alone (2023)
  • 28% of French public procurement is spent on works (OECP 2023 census)
  • ≈ 60% of public contracts awarded to SMEs (by number), with works contracts often split into lots
03 · Your challenges

Bidding for public tenders, without losing your nights to it.

The three pain points companies in the sector run into.

01 · Detection

Spotting the right tenders

Finishing works contracts are issued as separate lots or multi-supplier framework agreements, often at lower thresholds than the major works lots. They move fast and get lost among hundreds of notices: spotting painting, partition or joinery lots (CPV 45410000 · 45440000) at the right value and in your area is time-consuming.

02 · Analysis

Decoding the tender documents

The DCE (tender documents) sets out meticulous requirements (UPEC floor classification, acoustic and fire-resistance performance of partitions, room-by-room finishes) spread across the technical specifications (CCTP), drawings and an often bulky bill of quantities (DQE). Breaking down these requirements room by room takes hours before pricing even begins.

03 · Response

Writing the technical proposal

The technical proposal must demonstrate mastery of substrates, compliance with NF DTU 25.41 / 59.1, management of co-activity on occupied sites (care homes, schools, hospitals) and product traceability (VOCs, FDES environmental declarations). For every tender, everything has to be rewritten under deadline pressure.

04 · How it works

From contract notice to signed proposal.

Three steps, one agent, no extra tool to open.

01Detect

Detect

Explain monitors the BOAMP (France's official public procurement bulletin), legal notice publications, buyer profiles and e-procurement platforms, and surfaces relevant finishing works contracts (CPV 45410000 · 45420000 · 45430000 · 45440000): local authorities, social housing landlords, hospitals and schools in your area, distinguishing call-off lots from one-off contracts, with real-time alerts, ahead of your competitors.

BOAMPJOUEPLACETerritories
02Analyse

Analyse

The AI reads the CCTP, the special administrative terms (CCAP) and the DQE, and sets out the requirements by lot and by room (UPEC classifications, acoustic and fire-resistance requirements), phasing in occupied buildings and the weighted award criteria.

CCTPCriteriaBPUStandards
03Respond

Respond

The agent drafts a first version of the technical proposal: methodology per lot, surface preparation, co-activity management, environmental approach (VOCs, waste), drawing on your references. Pricing and product choices stay with your teams.

Word add-inTechnical proposalQSE
Explain · from tender to proposal
A+
Tender detected · high relevance
Targeted CPV · published 2 h ago
Detect
B
Requirements extracted from the CCTP
Standards, award criteria, deadlines
Analyse
✓
Technical proposal generated
First draft ready in Word
Respond
05 · What Explain covers

The sector's entire scope, covered.

  • Subject: Rehabilitation of a care home (EHPAD): finishing works lots
  • Lots: Partitions and linings · interior joinery · painting · resilient flooring
  • Form: Call-off framework agreement · 4 years · CCAG Travaux (general administrative terms for works)
  • Standards: NF DTU 25.41 · 36.x · 58.1 · 59.x
06 · Winning the contract

What the buyer assesses, and what gets you eliminated.

Read the full technical proposal guide for this sector (in French)
✓What the buyer assesses
  • Technical merit (≈ 40 to 60%): methodology per lot, surface preparation, management of co-activity and the all-trades schedule, acceptance.
  • Price (≈ 40 to 50%): consistency of the bill of quantities (DQE) per lot, no abnormally low bid.
  • Compliance & environment: NF DTU 25.41 (plasterboard), 58.1 (ceilings), 59.x (painting), UPEC floor classification, VOC/FDES traceability.
✕Mistakes that disqualify you
  • Room-by-room requirements not met: required UPEC floor classification, acoustic performance or fire resistance not covered.
  • DTUs not addressed: NF DTU 25.41 / 58.1 / 59.x required by the CCTP not reflected.
  • DQE inconsistent with the CCTP: quantities, units or finishes per lot not matching the tender file. A frequent reason for rejection.
07 · They bid with Explain

What companies in the sector using Explain say.

Portrait · coming soon
“

“Explain helps us better understand the ecosystems of the new business areas where we are looking to win market share.”

Anne-Catherine Sublon
Director · Vinci Energies
08 · Sector questions

Frequently asked questions.

Does Explain handle call-off framework agreements, which are common in finishing works?

Yes. The agent identifies the contract form (single or multi-supplier framework agreement, purchase orders), its duration and maximum value, so you know immediately whether it is recurring volume or a one-off project.

How does Explain handle room-by-room requirements in a finishes CCTP?

It extracts the requirements spread across the technical specifications (CCTP) and the bill of quantities (DQE) (UPEC floor classifications, acoustic and fire-resistance performance of partitions, paint finishes) and presents them in a structured way, ready to feed into the technical proposal and pricing.

How does Explain handle the finishing works NF DTUs referenced in the CCTP?

The agent identifies the mandatory DTUs (NF DTU 25.41 for plasterboard works, NF DTU 58.1 for suspended ceilings, NF DTU 59.x for painting and wall coverings) and sets out the associated installation and acceptance requirements, ready to structure your technical proposal lot by lot.

Does Explain cover co-activity and the all-trades schedule in occupied buildings?

Yes. It surfaces the constraints of co-activity, all-trades phasing and working in occupied buildings (care homes, schools, hospitals), as well as acceptance procedures, all decisive for technical merit and site organisation.

Does Explain price our lots for us?

No. It detects tenders, analyses the tender documents (DCE) and drafts the first version of the technical proposal. Quantity surveying, product choices and prices stay with your teams.

Let's talk

30 minutes on your finishes tenders

See how Explain detects your finishing works lots, breaks down the CCTP room by room and drafts the first version of your technical proposal, on a real DCE from your sector, in 30 minutes.

Reply within 24 h