NewThe AI agent that writes your technical proposals directly in Word.Discover

Construction · Roads, utilities & earthworks

The AI agent that speaks roads & utilities, earthworks and public space development

Roads, dry and wet utility networks, earthworks and urban development for public infrastructure contracts.

Sector tender monitoring
A+
New tender detected
Published 2 h ago · high relevance
GO
More than 250 companies already use Explain, from SMEs to large groups.
VEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTSVEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTS
02 · The sector in figures
  • ≈ €15bn a year for the French roads, utilities and sewerage market
  • ≈ €7.9bn turnover for earthworks alone (≈ 18% of public works activity)
  • ≈ 40% of public procurement for infrastructure works comes from local authorities
  • ≈ 60% of public contracts awarded to SMEs (by number), with works contracts often split into lots
03 · Your challenges

Bidding for public tenders, without losing your nights to it.

The three pain points companies in the sector run into.

01 · Detection

Spotting the right tenders

Roads and utilities contracts come mainly from municipalities, inter-municipal bodies and urban developers, as works lots or multi-year maintenance framework agreements. Spotting the relevant contracts (CPV 45233140 · 45232000) in your area, ahead of local competitors, means continuously monitoring a multitude of buyer profiles.

02 · Analysis

Decoding the tender documents

A roads and utilities DCE (tender documents) combines technical specifications (CCTP), network drawings, longitudinal profiles, a geotechnical study (G2/G5) and a very detailed line-by-line bill of quantities (DQE). Finding the referenced CCTG fascicules (2, 70, 71), the GTR soil classification, and the excavation and network-crossing constraints takes considerable time per file.

03 · Response

Writing the technical proposal

The technical proposal must demonstrate mastery of earthworks, compaction, pipe laying (DT-DICT declarations, trench reinstatement), spoil management and safety in urban areas under live traffic. For every tender, the methodology has to be realigned with the site context.

04 · How it works

From contract notice to signed proposal.

Three steps, one agent, no extra tool to open.

01Detect

Detect

Explain monitors the BOAMP (France's official public procurement bulletin), legal notice publications, buyer profiles and e-procurement platforms, and surfaces relevant roads, utilities and earthworks contracts (CPV 45233140 · 45232000 · 45112500 · 45233200): municipalities, inter-municipal bodies and urban developers in your area, distinguishing one-off contracts from maintenance framework agreements, with real-time alerts, ahead of your competitors.

BOAMPJOUEPLACETerritories
02Analyse

Analyse

The AI delivers a summary of the DCE: type of works, referenced CCTG fascicules (2, 70, 71), GTR soil classification, network and phasing constraints, penalties and award criteria.

CCTPCriteriaBPUStandards
03Respond

Respond

The agent drafts a first version of the technical proposal: earthworks and pipe-laying methodology, spoil and DT-DICT management, site organisation in urban areas, environmental approach, drawing on your references. Pricing and technical choices stay with your teams.

Word add-inTechnical proposalQSE
Explain · from tender to proposal
A+
Tender detected · high relevance
Targeted CPV · published 2 h ago
Detect
B
Requirements extracted from the CCTP
Standards, award criteria, deadlines
Analyse
✓
Technical proposal generated
First draft ready in Word
Respond
05 · What Explain covers

The sector's entire scope, covered.

  • Subject: Roads and utilities for a mixed-development zone (ZAC): roads & utility networks
  • Lots: Earthworks · roads · wet utilities · dry utilities
  • Form: Works contract · 14 months · CCAG Travaux (general administrative terms for works)
  • Standards: CCTG fascicules 2, 3, 70, 71 · NF P 98
06 · Winning the contract

What the buyer assesses, and what gets you eliminated.

Read the full technical proposal guide for this sector (in French)
✓What the buyer assesses
  • Technical merit (≈ 40 to 60%): earthworks and pipe-laying methodology, spoil management, site organisation in urban areas under live traffic, phase-by-phase scheduling.
  • Price (≈ 40 to 50%): line-by-line consistency of the bill of quantities (DQE), no abnormally low bid.
  • Compliance & environment: CCTG fascicules 2 / 70 / 71, GTR soil classification, DT-DICT management, spoil recovery.
✕Mistakes that disqualify you
  • Existing networks ignored: DT-DICT declarations and network crossings not addressed, even though site safety depends on them.
  • Fascicules or classification not addressed: required fascicules 2/70/71 or GTR classification (NF P 11-300) not taken into account.
  • DQE incorrectly filled in: phase-by-phase scheduling, compaction or trench reinstatement inconsistent with the CCTP.
07 · They bid with Explain

What companies in the sector using Explain say.

Portrait · coming soon
“

“After these first few months of use, we can already say that 6 or 7 projects have been won thanks to Explain.”

Stéphanie Audinel
Company Director · Citeos
08 · Sector questions

Frequently asked questions.

Does Explain distinguish a one-off roads and utilities contract from a maintenance framework agreement?

Yes. The agent identifies the contract form (works contract or call-off framework agreement), its duration and value, so you can spot recurring multi-year maintenance contracts in your area.

How does Explain handle CCTG fascicules and soil classification?

It recognises the referenced fascicules (fascicule 2 for earthworks, 70 for sewerage, 71 for drinking water) and sets out the geotechnical information (GTR / NF P 11-300 classification, compaction requirements) useful for your technical proposal and pricing.

How does Explain handle phase-by-phase scheduling on a roads and utilities site?

The agent sets out how the DCE splits the works into phases, the sequence of earthworks, utilities and roads (fascicules 25 to 27 for pavements, NF P 98 for roads) and the constraints of working in urban areas under live traffic, so your technical proposal matches the real site organisation.

Does Explain cover DT-DICT declarations and the management of existing networks?

Yes. It surfaces the DT-DICT obligations (France's mandatory pre-works declarations near networks), the location and crossing of existing dry and wet networks and the constraints of excavation and trench reinstatement, which are decisive for site safety and bid compliance.

Does Explain draw up the bill of quantities (DQE) for us?

No. It detects tenders, analyses the tender documents (DCE) and drafts the first version of the technical proposal. Quantity surveying, the schedule of prices and technical choices stay with your teams.

Let's talk

30 minutes on your roads & utilities tenders

See how Explain detects your roads, utilities and earthworks tenders, breaks down the CCTP and drafts the first version of your phasing-based technical proposal, on a real DCE from your sector, in 30 minutes.

Reply within 24 h