NewThe AI agent that writes your technical proposals directly in Word.Discover

Supplies · Events

The AI agent that speaks scenography, logistics and event tenders

Event organisation, logistics, equipment hire and scenography for public event contracts.

Sector tender monitoring
A+
New tender detected
Published 2 h ago · high relevance
GO
More than 250 companies already use Explain, from SMEs to large groups.
VEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTSVEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTS
02 · The sector in figures
  • ≈ €10bn in turnover for the French events industry
  • €5.5bn spent by French companies on events in 2024
  • 1,200 trade shows and fairs held every year in France
  • ≈ 60% of public contracts in France awarded to SMEs (by number), with multi-supplier framework agreements open to SMEs
03 · Your challenges

Bidding for public tenders, without losing your nights to it.

The three pain points companies in the sector run into.

01 · Detection

Spotting the right tenders

Public event contracts are scattered across local authorities, cultural bodies, agencies and public institutions, and the vocabulary varies (organisation, logistics, scenography, equipment hire). Spotting the right lots (CPV 79952000 · 79950000 · 92000000) in your area and in the right format requires careful tender monitoring.

02 · Analysis

Decoding the tender documents

An event tender file (DCE) means a functional specification that is sometimes vague, a lump-sum price breakdown (DPGF) to price by service and option, safety requirements for public-access buildings (ERP), accessibility requirements and very tight deadlines. Pinning down the real scope, the technical obligations and the weighted criteria (often technical merit and creative quality) is complex.

03 · Response

Writing the technical proposal

The technical proposal must present a creative statement of intent, the project methodology, human and material resources, safety and risk management and, increasingly, sustainable event practices (ISO 20121, reuse), entirely rethought for each event. Competition largely comes down to the quality of this response.

04 · How it works

From contract notice to signed proposal.

Three steps, one agent, no extra tool to open.

01Detect

Detect

Explain monitors the BOAMP (France's official public procurement bulletin), legal notice publications, buyer profiles and e-procurement platforms, and surfaces relevant event tenders (CPV 79952000 · 79950000 · 79952100 · 92000000): local authorities, cultural bodies and public institutions in your area, at the right value, whether framework agreements or one-off contracts, with real-time alerts, ahead of your competitors.

BOAMPJOUEPLACETerritories
02Analyse

Analyse

For each tender file (DCE), the AI delivers a summary: scope and expectations, lot structure, DPGF lines, ERP safety and accessibility requirements, CSR expectations (ISO 20121) and award criteria.

CCTPCriteriaBPUStandards
03Respond

Respond

The agent drafts a first version of the event technical proposal (statement of intent, methodology, human and material resources, safety and sustainability approach) based on your references and past projects. Your teams keep control of pricing, creative direction and technical choices.

Word add-inTechnical proposalQSE
Explain · from tender to proposal
A+
Tender detected · high relevance
Targeted CPV · published 2 h ago
Detect
B
Requirements extracted from the CCTP
Standards, award criteria, deadlines
Analyse
✓
Technical proposal generated
First draft ready in Word
Respond
05 · What Explain covers

The sector's entire scope, covered.

  • Purpose: Organisation and logistics of an institutional event for a local authority
  • Lots: Organisation · equipment hire · scenography · technical services
  • Form: Call-off framework agreement / service contract · 4 years · lump-sum price breakdown (DPGF)
  • Standards: ERP & public safety · ISO 20121 (sustainable events) · PMR accessibility
06 · Winning the contract

What the buyer assesses, and what gets you eliminated.

Read the full technical proposal guide for this sector (in French)
✓What the buyer assesses
  • Technical merit (≈ 50 to 60%): statement of intent and scenographic approach, project methodology, human and material resources, assembly/dismantling schedule.
  • Price (≈ 30 to 40%): consistency of the DPGF, pricing of services and options, no abnormally low bid.
  • Sustainable events & safety: ISO 20121, reuse and waste management, public safety (ERP) and PMR accessibility.
✕Mistakes that disqualify you
  • Missing or vague public safety section: no ERP arrangements or assembly/lifting plan, missing third-party liability insurance certificate.
  • Incomplete or inconsistent DPGF: unpriced options, incorrect quantities, mandatory services left out.
  • PMR accessibility not addressed: non-compliant venues and facilities when the DCE expressly requires compliance.
07 · They bid with Explain

What companies in the sector using Explain say.

Portrait · coming soon
“

“One of the main benefits of the tool is being able to anticipate.”

Sarah Voisin
Head of Regional Relations · Bouygues Télécom
08 · Sector questions

Frequently asked questions.

Do event contracts go through framework agreements?

Often: local authorities and public bodies use call-off framework agreements for their recurring events, supplemented by one-off contracts for major occasions. Explain identifies both and tracks how often they recur.

How does Explain handle safety and accessibility requirements?

It extracts from the tender documents (DCE) the obligations for public-access buildings (ERP), public safety, accessibility for people with reduced mobility (PMR) and CSR expectations (ISO 20121), and structures the technical proposal to address them explicitly.

How does Explain handle ERP regulations and the assembly/dismantling of structures?

The agent identifies in the technical specifications (CCTP) the obligations relating to public-access buildings (ERP), the qualifications required for structure assembly and lifting, the assembly/dismantling schedule and the third-party liability insurance certificates expected, then structures the proposal to cover the safety section, which is often grounds for disqualification.

Can Explain handle ISO 20121 sustainable events and PMR accessibility?

Yes. It extracts from the CCTP the sustainable event expectations (ISO 20121: reuse, waste management, mobility) and the accessibility requirements for venues and facilities, then builds the outline of the CSR and accessibility sections of your proposal, which carry increasing weight in the score.

Does Explain design the scenography for us?

No. Explain detects tenders, analyses the DCE and drafts the first version of the technical proposal. Creative direction, pricing and technical choices remain with your teams.

Let's talk

30 minutes with an events procurement expert

See how Explain detects your event tenders, breaks down the DCE (DPGF, ERP, ISO 20121, PMR accessibility) and starts the first version of your statement of intent and technical proposal, on a real tender file from your sector, in 30 minutes.

Reply within 24 h