NewThe AI agent that writes your technical proposals directly in Word.Discover

Services · Facility management

The AI agent that speaks multi-technical, CMMS and operations and maintenance tenders

Multi-technical maintenance, building operations and CMMS for service framework agreements with local authorities and public bodies.

Sector tender monitoring
A+
New tender detected
Published 2 h ago · high relevance
GO
More than 250 companies already use Explain, from SMEs to large groups.
VEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTSVEOLIACORSICA SOLEVINCITENERGIESUEZPROLUDICBOUYGUES TELECOMARKOLIAEUROVIAWATURATOTALENERGIESSOLEIL DU MIDIENGIEFESTILIGHTTRANSDEVREDENSNCFAKÉA ÉNERGIESGRDFTERIDEALNEOENREFECTORYSPIEVENSOLAIREGISWEMAINTAINIMERYSELICIODOCTOLIBHUSSONDERICHEBOURGROOM SAVEURSUGAPCAISSE DES DÉPÔTS
02 · The sector in figures
  • ≈ €40bn in outsourced facility management spending in France (multi-service and multi-technical)
  • 24 major groups belonging to SYPEMI, the French building maintenance trade body
  • Multi-year call-off framework agreements: the dominant form of public operations contracts
  • ≈ 60% of public contracts awarded to SMEs (by number), mostly multi-year call-off contracts
03 · Your challenges

Bidding for public tenders, without losing your nights to it.

The three pain points companies in the sector run into.

01 · Detection

Spotting the right tenders

Operations and maintenance tenders hide behind notices with varied subjects: “operation of thermal installations”, “multi-technical maintenance”, “P2/P3 contracts”. Spotting the right framework agreements (CPV 50700000 · 71315000) in your area, before the incumbent contractor's renewal, means monitoring every buyer profile and every platform.

02 · Analysis

Decoding the tender documents

Facility management tender documents combine technical specifications, a property inventory, a detailed BPU (P2 lump sum, P3 price schedule), service levels (GIR, CMMS, on-call duty) and weighted criteria on the operating methodology. Rebuilding the exact scope of installations to maintain takes hours per tender.

03 · Response

Writing the technical proposal

The technical proposal must demonstrate the organisation of rounds, team sizing, CMMS, GIR response times, on-call duty and the expected energy performance approach. All of this has to be rewritten for every tender, under the pressure of submission deadlines.

04 · How it works

From contract notice to signed proposal.

Three steps, one agent, no extra tool to open.

01Detect

Detect

Explain monitors the BOAMP, legal notice journals, buyer profiles and e-procurement platforms, and surfaces relevant operations and maintenance framework agreements (CPV 50700000 · 71315000 · 79993000): local authorities, social landlords, hospitals and public bodies in your area, at the right value, before the incumbent contractor's renewal, with real-time alerts, ahead of your competitors.

BOAMPJOUEPLACETerritories
02Analyse

Analyse

For each set of tender documents, the AI produces a summary: scope of installations, technical lots, form (call-off framework agreement), P2 lump sum and P3 price schedule, service levels, on-call duty and award criteria.

CCTPCriteriaBPUStandards
03Respond

Respond

The agent drafts a first version of the operations technical proposal (organisation of interventions, CMMS, team sizing, preventive maintenance plan, energy performance) based on your references. Your teams keep control of P2/P3 pricing and technical choices.

Word add-inTechnical proposalQSE
Explain · from tender to proposal
A+
Tender detected · high relevance
Targeted CPV · published 2 h ago
Detect
B
Requirements extracted from the CCTP
Standards, award criteria, deadlines
Analyse
✓
Technical proposal generated
First draft ready in Word
Respond
05 · What Explain covers

The sector's entire scope, covered.

  • Subject: Operation and multi-technical maintenance of a property portfolio (school complex, town hall, sports hall)
  • Lots: HVAC · high/low voltage electrical · plumbing and sanitary · statutory inspections
  • Form: Call-off framework agreement · 4 years · CCAG FCS · P2 lump sum + P3 works
  • Standards: ISO 41001 · NF X60-000 · GA P2-040 (maintenance log) · periodic statutory inspections
06 · Winning the contract

What the buyer assesses, and what gets you eliminated.

Read the full technical proposal guide for this sector (in French)
✓What the buyer assesses
  • Technical merit (≈ 50 to 60%): operating methodology, preventive maintenance plan, CMMS, team sizing, GIR response times and on-call duty.
  • Price (≈ 30 to 40%): consistency of the P2 lump sum and the P3 price schedule, no abnormally low bid.
  • Performance & continuity: ISO 41001, NF X60-000, energy performance, service continuity and periodic statutory inspections.
✕Mistakes that disqualify you
  • Missing statutory inspections or authorisations: required electrical authorisations (NF C 18-510), qualifications or periodic inspection plan not provided.
  • Scope of installations poorly reflected: incomplete property inventory, P2 lump sum inconsistent with the CCTP.
  • On-call duty or service continuity not covered: required on-call organisation or response times (GIR) not described.
07 · They bid with Explain

What companies in the sector using Explain say.

Portrait · coming soon
“

“Explain helps us better understand the ecosystems of the new business lines in which we are looking to gain market share.”

Anne-Catherine Sublon
Director · Vinci Energies
08 · Sector questions

Frequently asked questions.

Are operations and maintenance contracts often framework agreements?

Yes. The dominant form is the multi-year call-off framework agreement (often 4 years), with a P2 operating lump sum and a P3 price schedule for works. Explain identifies this structure and targets the tenders that fit your scope.

Does Explain understand the logic of P2/P3/P4/P5 contracts?

Yes. The agent reads the technical specifications (CCTP), the property inventory and the schedule of prices (BPU), separates the operating lump sum from major maintenance and renewal services, and structures the technical proposal by technical lot (HVAC, electrical, plumbing).

Does Explain incorporate the ISO 41001 and NF X60-000 standards required in the tender documents?

Yes. It identifies the facility management system requirements (ISO 41001) and the NF X60-000 / NF EN 13306 maintenance terminology used in the CCTP, then structures the technical proposal to align your organisation with these standards and the required service levels.

Can Explain handle CMMS, on-call duty and multi-technical service continuity?

Yes. It extracts from the CCTP the CMMS requirements (traceability of interventions, BMS), guaranteed response times (GIR), on-call organisation and the expected service continuity across all technical lots, then builds the framework for the operating methodology in your technical proposal.

Does Explain price the P2 lump sum for us?

No. Explain detects tenders, analyses the tender documents (DCE) and drafts the first version of the technical proposal. P2/P3 pricing, sizing and technical choices remain with your teams.

Let's talk

30 minutes with an operations tenders expert

See how Explain detects your multi-technical maintenance framework agreements, unpacks the CCTP (P2 lump sum, P3 price schedule, CMMS, ISO 41001) and drafts the first version of your operations technical proposal, on real tender documents from your sector, in 30 minutes.

Reply within 24 h